Email:gzouyeedisplay@gmail.com | 22+ Years Store Display Fixtures Supplier

Hair & Wig Store Design | Custom Wig Store Fixtures

✅ One-Stop Customization
Interior 3D design · Flexible layout / size / materials / branding

🏭 Factory-Direct Pricing
No middleman · 25+ years experience

📌 Certified Quality
ISO 9001 · CE · UL · RoHS Certified

🌍 Global Project Experience
Trusted by retailers worldwide

🚚 Secure Delivery & Lead Time
Production: 20–30 days · Shipping: 20–45 days (Air / Sea freight)

Cerfificates – Ouyee Display

Hair Wig Store Design with Custom Wig Display Fixtures

This hair wig store design focuses on creating a professional, salon-like retail environment where customers can comfortably try on and compare different wig styles. Continuous wall systems with shelves and hooks are paired with glass display cabinets, wig stands, and fitting mirrors to build a complete shopping experience.

The layout separates synthetic wigs, human hair wigs, and medical wigs into clear zones, helping customers quickly locate styles and lengths. Central islands and low counters keep sight lines open, while illuminated signage and logo panels strengthen your brand image.

  • 🟧 Full shop design from floor plan to furniture production
  • 🟧 Wall wig shelves, pegboard hooks, and mannequin head displays
  • 🟧 Fitting mirrors and trial area for easy wig testing
  • 🟧 Lockable glass cabinets for premium or high-value pieces
  • 🟧 Harmonized colors, flooring, and lighting for a cozy salon atmosphere

From a small wig boutique to a busy high-street store, this design concept helps you showcase more styles in limited space and deliver a smooth, confidence-building shopping journey.

Why Choose Ouyee

🎯 End-to-End Custom

— From concept and 3D planning to final finish. Flexible modules, sizes, materials, lighting, and brand graphics tailored to your store.

🧪 Quality You Can Verify

— Multi-point QC, export-grade packing, and electrical compatibility for 110/220V markets. Certification support available (ISO 9001 / CE / UL / RoHS upon request).

🏭 In-House Manufacturing

— Metal, wood, glass, and coating under one roof for tighter cost control and fewer layers between you and the build. 20+ years making retail fixtures.

🌐 Proven Abroad

— Projects delivered across 50+ countries with English drawings, install manuals, and remote tech support. Flat-pack kits labeled for quick on-site assembly.

🚚 Predictable Delivery

— Typical build window 20–30 days; international transit commonly 20–45 days by air or sea depending on route and volume.

Our Design Team

Ouyee’s design team turns brand intent into buildable retail spaces and fixture systems. We start with zoning and merchandising, then engineer every joint for durability and ease of installation.

Workflow: brand brief → zoning/traffic → 3D visuals → shop drawings → production handover

design team (11)
design team (4)
Client Communication on Design Plans - 4
Client Communication on Design Plans - 3
Shop 3D Design Services

Get all the latest information on shop design ideas, sales and offers. Subscribe to the newsletter.

Frequently Asked Questions

  • Workflow: Brief/site data → zoning & traffic concept → 3D visuals review → shop/part drawings + BOM → production handover and post-check.

  • Deliverables:

    1. Moodboard and material board (color chips, metals, wood veneers, glass, lighting styles)

    2. Floor plan with traffic flow, key elevations/details, lighting and power layout

    3. 3–6 hero 3D renders (optionally day/night or on/off lighting)

    4. Shop/part drawings, hardware & lighting schedules, draft packing list

    5. Basic install guide and maintenance notes; export-ready English documentation

  • Typical timeline for 80–150 m²: concept & zoning 3–5 business days; full drawing set + renders 2–4 weeks; production prep 3–5 business days.

  • Revisions: 2–3 key rounds included (plan, materials, hero views). Extra views, structural changes, or out-of-scope edits billed by effort.

  • Drivers: size and complexity, brand standards depth, cross-border compliance, custom hardware or curved/oversize glass.

  • Essentials: floor plan or CAD, site photos and grid/columns, ceiling height and load limits, target budget and opening date.

  • Brand & merchandise: brand guide or references, SKU list and merchandising method, target audience and price bands.

  • Compliance: fire and accessibility requirements, electrical voltage/plug standards, security/CCTV needs.

  • No plan yet? Provide rough dimensions and a sketch. Ouyee can draft a basic layout and flow first.

  • Packaging: modular flat-pack, foam + corner guards + plywood crates, multilingual labels and packing list.

  • Shipping: door-to-door or port terms; consolidation available; fragile parts separately crated with thicker liners.

  • Installation: local crew assembles; Ouyee provides remote technical support. Numbered parts and detail drawings for complex zones. Typical 80–150 m² installs complete major assembly in 1–3 days.

  • After-sales: report damages within 7 days with photos and list. Standard replacement flow. Spare-parts kit for common consumables.

    • Fees: by area/complexity or packaged per project. A negotiated portion of design fees can be offset if production proceeds with Ouyee.

    • Lead times: samples 7–10 days; mass production 25–35 days depending on quantity and processes.

    • MOQ: whole-store projects have no MOQ; custom single models commonly start around 10 sets, subject to structure.

    • Warranty: 12 months for structure and lighting/electrical against non-misuse failures. Misuse or unauthorized changes excluded.

    • Governing document: signed shop/part drawings govern production; renders communicate design intent.

     
     

Related Shop Design Ideas

Ask For A Quick Quote

Get A Free Custom Quote

Get A Free Custom Quote

Get Free PDF Catalog

Please simply provide your project information so that we can offer you better service. Thank you.

*OUYEE takes your privacy very seriously. All information is only used for technical and commercial communication and will not be disclosed to third parties.